Two boards of the same size can differ in assembly cost by several times. The reason is usually not machine cost but the preparation and inspection load the job carries. Below are seven factors that determine price, and what to compare when evaluating a quotation.
1. Production quantity
Assembly is dominated by fixed costs: stencil fabrication, line setup, program loading and first-article verification. Divided by quantity, these costs make small batches expensive per unit. In serial production the same setup is spread across many boards.
2. Board size and panelisation
The area a board occupies on the line determines how many boards can be processed at once. For small boards, panelisation improves throughput; a poorly designed panel creates material loss and extra labour.
3. Component count and type
As component count rises, placement time and inspection load rise with it. Fine-pitch ICs, BGAs and connectors require additional accuracy, special nozzles and sometimes X-ray inspection. These are reflected directly in price.
4. BOM availability
In turnkey production, component sourcing is a major part of the cost. Long-lead, out-of-stock or single-source items increase it. Alternative part proposals can reduce both cost and lead time.
5. Single-sided or double-sided
Double-sided assembly requires a second print pass, a second reflow and an adhesive step for heavy components. That increases production time and the number of inspection points.
6. Test scope
There is a significant difference between AOI alone and AOI plus X-ray, ICT and functional test. Test scope should follow the reliability expectation of the product: unnecessary testing adds cost, while missing testing increases the risk of field failures.
7. Lead time
Fast delivery requires priority in the production plan and additional resources. Typical ranges are 5–10 working days for prototypes and 2–4 weeks for serial production; going below these ranges usually means extra cost.
When comparing quotations
Unit price alone is misleading. Compare the test scope, material quality and delivery terms included. Two quotations at the same price with different scope are not actually the same price.
To receive a comparable quotation for your project, send your BOM and Gerber files to our contact page.